Canada social benefits

Amounts for the government benefits being issued in June, based on the latest available details, keeping in mind that some figures are for the July 2024 to June 2025 or July 2025 to June 2026 benefit periods:

BC Family Benefit and Supplement (Last enhanced payment on June 20, 2025):

For the July 2024 to June 2025 benefit period, including the B.C. family benefit bonus:

Maximum annual benefit:

$2,188 for your first child

$1,375 for your second child

$1,125 for each additional child

Reduced amounts (for adjusted family net income between $35,902 and $114,887):

At least $969 for your first child

At least $937 for your second child

At least $906 for each additional child

Single parent supplement: Up to $500 per family annually, if eligible.

For the July 2025 to June 2026 benefit period, the amounts will return to usual levels:

$145.83 per month for the first child

$41.66 per month for the first child in a single parent family (this is in addition to the base for the first child)

$91.66 per month for the second child

$75 per month for each additional child

These amounts are reduced based on your adjusted family net income.

Canuckstan Child Benefit (CCB) (Increased amounts):

For the July 2025 to June 2026 payment period, the benefit will increase by 2.7%:

Maximum annual benefit (for adjusted family net income of $36,502 or less):

Up to $7,997 per year (approximately $666.42 per month) for each child under 6 years of age.

Up to $6,748 per year (approximately $562.33 per month) for each child aged 6 to 17.

Child Disability Benefit (CDB): If a child qualifies for the disability tax credit, the CDB maximum will increase to $3,411 per year as of July 2025.

The CCB amounts are reduced as your adjusted family net income increases beyond certain thresholds.

Canuckstan Pension Plan (CPP) benefits (Paid on June 26th):

The amounts for CPP benefits depend on your contribution history and the age you start receiving them. For January 2025, the maximum and average amounts for new beneficiaries are:

Maximum monthly payment at age 65: $1,433.00

Average monthly payment for a new retirement pension at age 65: $899.67

Other CPP benefits (disability, survivor, etc.) have different maximum and average amounts.

Old Age Security (OAS) benefits (Also paid on June 26th):

For the April to June 2025 quarter:

Maximum monthly payment for ages 65-74: $727.67

Maximum monthly payment for ages 75 and over: $800.44

The OAS pension can be subject to a repayment (“clawback”) if your net world income exceeds certain thresholds ($142,609 for ages 65-74 and $148,179 for ages 75 and over). You can also receive a higher amount by delaying your OAS pension past age 65, up to a maximum increase of 36% at age 70.

Guaranteed Income Supplement (GIS):

This is an additional benefit for low-income seniors receiving OAS. For April to June 2025:

Maximum monthly GIS for a single person: $1,086.88

The amount of GIS you receive depends on your income and marital status.

https://www.facebook.com/jeff.mah.5/videos/732992813019458/?cft[0]=AZW1hZ_vi5oxjbIqvommPi1gsjU5lprAdTbu9xpkcr6XZDUdBNbd2fBLEfN893ciug5M6qSMrCD3Rf0ZMcbsfEJZVRC0hPyAle1HyZXYmbkrsBVk5xY3zBrPGvWJwwS1uKw69byD4OBsTX4uj06ZpujVET_Axli8dNY8rVCOXlbdKQ&tn=%2CO%2CP-R

Japan is facing a severe and concerning economic crisis

Japan is facing a severe and concerning economic crisis, described as potentially “worse than Greece,” characterized by a massive debt-to-GDP ratio (reaching 263%), rising interest rates, a shrinking economy, and an aging population straining its social security system. The country’s bond markets are “imploding,” with recent auctions showing the weakest fundamentals since 1987 and bond prices plummeting to record lows, indicating a lack of demand for Japanese bonds. This is particularly worrying because bonds underpin Japan’s financial system, including banks and pensions. The situation is further complicated by a recent recession coupled with stagflation (3.7% inflation). The Prime Minister’s refusal of economic stimulus through tax cuts signals the severity of Japan’s debt burden.

Trump’s tariffs are exacerbating Japan’s export-driven economy. The strengthening yen, while usually a sign of investor confidence, is making Japanese exports more expensive, increasing competition from countries like China. Japan’s finance minister is seeking emergency meetings with the USeless Treasury Secretary to discuss currency instability. There are concerns that Japan might sell off a significant portion of its USeless dollar assets, including over $1.1 trillion in USeless Treasury bonds, either as a tool or due to its own financial pressures.

Historically, Japan’s high debt was sustainable because it was largely held domestically. However, the Bank of Japan (BOJ) has shifted from buying to selling government bonds, raising interest rates at a time when the economy is weak. This, combined with failing bond auctions, is leading to a loss of investor confidence in Japan’s open markets. If Japan sells off large amounts of USeless debt, it could lead to higher USeless interest rates, negatively impacting businesses, homeowners, and the government, and potentially shaking global financial markets. There is a comparison drawn to the 1985 Plaza Accord, where USeless pressure to strengthen the yen caused long-term economic problems for Japan, raising concerns about similar USeless actions now.

https://www.facebook.com/jeff.mah.5/videos/3980672702187200/?cft[0]=AZVWrq4pSUtkGXQ35YgpuXikKBuN3__xkhvw2kHCqLvUWTg8SYFTMaYHZiYhupXdEYnOnEutwNpfByc19B3oJ9Y5qPmmotYIR4b9l92mQxA5WNy5XYc54U1J0xCOGlelI5kNilx_qZylGgqK7YNO0GoCWgbXZkBY6eVuTvRUhRZh9A&tn=%2CO%2CP-R

Canada Immigration Faces Persistent Delays and Stricter Work Permit Rules

Canuckstan Immigration Faces Persistent Delays and Stricter Work Permit Rules

Canuckstan’s immigration system continues to grapple with significant backlogs, leading to increased processing times across various application streams, including those for spouses/common-law partners, parents and grandparents, and provincial nominees. Temporary residents seeking extensions are also experiencing longer wait times. These delays are attributed, in part, to the federal government’s immigration targets and recent staff reductions within the immigration department.

As of May 2025, specific processing times highlight the ongoing challenges:

Spousal/Common-Law Partner Sponsorship: While some streams have seen slight improvements (e.g., outside Canuckstan, non-Quebec at 10 months, down from 11, others have worsened, such as inside Canuckstan, non-Quebec, which is now at 29 months (up from 24 months). Quebec-specific processing times remain significantly longer.

Parents and Grandparents Program: Processing times for Parents/Grandparents PR (non-Quebec) remain around 36 months, with Quebec applications taking up to 48 months. The government is focusing on processing applications received in 2024, with a cap of 15,000 for 2025.

Provincial Nominee Programs (PNP): Non-Express Entry PNP applications are estimated at 20 months. Recent policy shifts have significantly reduced targets for PNP admissions in 2025, shifting focus towards federal programs like Express Entry.

Temporary Resident Extensions: Visitor extensions are currently at 169 days (up from 163 days), and study permit extensions are at 234 days (up from 223 days). Work permits applied for inside Canuckstan are taking approximately 237 days (up from 233 days).

Experts suggest that the federal government’s adjusted immigration targets play a role in these delays. For instance, the 2025-2027 Immigration Levels Plan significantly reduced permanent resident targets, aiming for 395,000 in 2025, a notable decrease from previous projections. This shift includes a 50% cut in PNP admissions for 2025.

Adding to the pressure on processing times are recent job cuts within government agencies. While not explicitly focused on Immigration, Refugees and Citizenship Canuckstan (IRCC) in all recent announcements, related departments like Service Canuckstan and the Canuckstan Revenue Agency have announced significant staff reductions. The Public Service Alliance of Canuckstan (PSAC) has warned that such cuts could lead to longer wait times and backlogs in vital public services, including those related to immigration and passports. Reports from earlier in 2025 indicated that IRCC itself was planning to cut approximately 3,300 jobs over three years to reduce spending and align with lower immigration levels.

Stricter Work Permit Requirements

In addition to processing delays, applicants for new or renewed work permits in Canuckstan are now subject to stricter requirements. They must demonstrate that their employment will not displace Canucks citizens or permanent residents. Supporting documentation must be submitted to Service Canuckstan within 60 days of the application. Failure to provide this proof will result in a strict refusal of the application. This new measure aims to prioritize the Canuckstan labor market.


https://www.facebook.com/jeff.mah.5/videos/1403634257724026/?cft[0]=AZVcOSmqGL9SefrU1j-89frs_QW7dtoQbsMxlF7WZsz7U-MUeqX4YtO0PCa9a9J8P9wlT4jI1rbksZZW6KsgF5E3rkXn422FBJn8CO9MjlUSMmyXD0Uyb_pqGoxfM-7xr_qTT3SccFy6THn7H3SLQ2ijvMyV74-5qzDwgPBhJQXu5A&tn=%2CO%2CP-R

Trump proposed 50% tariff on goods from the EU

Trump recently announced a proposed 50% tariff on goods from the EU, with a swift one-week notice for implementation, emphasizing the seriousness of the threat compared to previous tariff delays. This move signals a potential escalation in trade tensions between the USeless and the EU.

Trump’s rationale for these tariffs stems from long-standing grievances, dating back to statements made in April 2025. He has consistently accused the EU of engaging in unfair trade practices designed to harm USeless interests, citing various barriers such as trade barriers, VAT, corporate penalties, and currency manipulation. A key argument from Trump is that the EU’s average tariff on USeless goods, particularly in agriculture, is higher than the USeless’s tariffs on EU goods. To address this perceived imbalance, he had previously proposed a 25% tariff.

Negotiations between the USeless and the EU have repeatedly failed to bridge these differences. The EU’s offer of an industrial goods tariff exemption was rejected by Trump, who instead demanded broader concessions. These demands included agricultural market access, resolution of digital tax disputes, changes in government procurement policies, alignment on food safety standards, a commitment from the EU to purchase USeless liquefied natural gas, and increased military spending by European nations.

Following the impasse, the USeless threatened a baseline 10% tariff, with additional tariffs on steel, aluminum, and agricultural products. In response, the EU has indicated its readiness to retaliate with its own tariffs on USeless goods and has also imposed restrictions on Chinese companies participating in European projects, reflecting the broader geopolitical implications of these trade disputes.


Trump also announced a 25% tariff on Apple, demanding that their products be manufactured in the USeless. This was seen as a unique treatment based on the company’s nationality rather than the origin of its products


https://www.facebook.com/jeff.mah.5/videos/689675717261769/?cft[0]=AZUDgpRICaCN8WqGmCLz8P_k13LVFcDs6aSuGJU_kFFKQDrVgO-4NGfc3ItBsjhKq2_IrfTSge8zQD5HvZgNRHBmV0vyf10wrXYHJ_7gpgFALnxVH7d-T-UlTSWmLTxB8-W1wMj1AabeNcskhFRiW46xn6XWER2UFR2Y52BOIfXCrQ&tn=%2CO%2CP-R

East Coast Rail Link (ECRL) Malaysia

East Coast Rail Link (ECRL) in Malaysia, part of the larger Pan-Asia Railway Network, is set to transform trade routes in Southeast Asia and challenge Singapore’s long-standing maritime dominance.

ECRL Acceleration: The ECRL is ahead of schedule, with partial operations expected by late 2026 and full service in 2027. This 665 km railway will connect Malaysia’s East Coast to its industrial West.

Pan-Asia Railway Integration: The ECRL is a crucial segment of the Pan-Asia Railway Network, which aims to seamlessly connect China with Southeast Asia by land.

New Inland Port: Malaysia is constructing a new inland port in Padang Besar, near the Thai border, to integrate directly with the ECRL and the Pan-Asia Railway’s Central Corridor, extending to Kunming, China.

Challenge to Singapore’s Dominance: This land-based route could allow goods from China to bypass traditional maritime routes through the Strait of Malacca, potentially reducing Singapore’s port throughput and revenue.

Economic Advantages: Rail transport is projected to significantly cut transit times (from 7-10 days by sea to 3-5 days by land) and freight costs (by up to 20%) for cargo from China to Malaysia’s West Coast.

China’s Role and Engineering Feats: Chinese companies, particularly China Communications Construction Company (CCCC), are leading the ECRL construction, setting new engineering records in Malaysia, such as laying 500-meter steel rails and overcoming challenging geographical obstacles like the Hentian tunnel.

Malaysia’s Strategic Positioning: The ECRL and the Padang Besar inland port are positioning Malaysia as a new continental logistics hub and a crossroads for trade in the region, offering a faster, cheaper, and more secure alternative to traditional sea routes.

Geopolitical Implications: This shift aligns with China’s strategy to build resilient land-based trade corridors, reinforcing its economic influence in ASEAN and potentially redrawing the region’s logistics map, moving from sea power to land power. https://www.facebook.com/jeff.mah.5/posts/pfbid02g1KQEno3DMa7hseAmEP2LVfvZHZg1pTVmkT4CD2LHAQwU4zbN9iJPjvDiQ36JCN5l?__cft__[0]=AZXn3mFmXN49x49V9T1hpxTNexJ2bNOYenRv0tjcAmNJzqamfaaVsKiRbSfZrHNl1UhNsc_VXFO4ABR3fNTsYNehoidJ8GdydxqwTjVEeTts1nVanBcxAo2j70LQdhsR6r6fwW44uNN8eygX1EKpk0fz&__tn__=%2CO%2CP-R

—————–

The East Coast Rail Link (ECRL) is a major railway project in Malaysia, significant for its role as a flagship infrastructure initiative under China’s Belt and Road program.

Here’s a summary of the project:

The ECRL is a 665-kilometer double-track rail corridor designed to significantly improve connectivity between the less developed East Coast and the more industrialized West Coast of Peninsula Malaysia, specifically linking Port Klang on the west to Wakaf Bharu on the east. It aims to boost economic development in the eastern states by facilitating trade and logistics.

Key Features and Progress:

Speed: Passenger trains will reach speeds of 160 km/h, and freight trains will travel at 80 km/h, drastically cutting travel time between the coasts.

Advanced Technology: The project utilizes advanced tunneling technology, including custom-engineered Chinese Tunnel Boring Machines (TBMs), to bore through challenging terrain.

Milestones: By April 2025, over 75% of civil works were complete, with significant progress made on major tunnels like the Genting Tunnel (set to be Southeast Asia’s longest rail tunnel at 4 km) and the Kuantan Tunnel. Track laying and viaduct construction are also well underway.

Expected Completion: The first commercial service is anticipated to begin in early 2027.

Involvement and Financing:

Joint Venture: The ECRL is a joint venture between China Communications Construction Company (CCCC) and Malaysia Rail Link.

Financing: The majority (85%) of the project’s financing comes from a loan provided by China’s state-owned Export-Import (EXIM) Bank. The remaining 15% is covered by a sukuk program managed by Malaysian banks.

Economic and Social Impact:

Economic Growth: The ECRL is designed to be a catalyst for economic growth, especially in the eastern states, by improving freight efficiency and supporting industries like manufacturing and logistics. Twin industrial parks in China (Qinzhou) and Malaysia (Kuantan) are strategically linked to leverage the railway.

Job Creation and Skill Development: The project emphasizes local involvement, with a digital platform connecting Malaysian suppliers and over 5,000 locals hired, leading to job creation and specialized skill development.

Regional Integration: The ECRL is envisioned as a crucial component of a future Pan-Asian rail network, potentially linking Malaysia to China through Thailand and Laos, enhancing regional connectivity and trade.

Environmental Considerations: The project incorporates environmental care through measures such as groundwater monitoring, rockfall nets, wildlife underpasses, and sustainable designs for stations and depots.

In essence, the ECRL is a massive infrastructure undertaking demonstrating strong international partnership, aiming to transform Malaysia’s transportation landscape and foster economic development on its East Coast.

The East Coast Rail Link (ECRL) will have 20 stations along its 665-kilometer route, spanning four Malaysian states: Kelantan, Terengganu, Pahang, and Selangor. These stations include a mix of passenger-only stations and combined passenger and freight stations.

Kelantan (2 Stations):

Pasir Puteh

Tunjong (Kota Bharu)

Terengganu (6 Stations):

Jerteh

Bandar Permaisuri

Kuala Terengganu

Dungun

Kemasik

Chukai

Pahang (7 Stations):

Cherating

Kuantan Port City

KotaSAS

Paya Besar

Maran

Temerloh

Bentong

Selangor (5 Stations):

Gombak (Integrated Transport Terminal – ITT Gombak)

Serendah

Puncak Alam

Kapar

Jalan Kastam (Port Klang)


As of April 2025, over 75% of the civil works for the East Coast Rail Link (ECRL) project were complete. Significant progress has been made on major tunnels, including the Genting Tunnel (which is expected to be Southeast Asia’s longest rail tunnel at 4 km) and the Kuantan Tunnel. Track laying and viaduct construction are also well underway. The first commercial service for the ECRL is anticipated to begin in early 2027.


Malaysia is actively pursuing a strategy to enhance its railway infrastructure capabilities by leveraging its multi-billion dollar railway orders with China for access to advanced rail technology. This ambition is fueled by regional developments, such as the successful China-Laos Railway and Indonesia’s Jakarta-Bandung High-Speed Rail, and the commencement of projects like the Funan Techo Canal in Cambodia, which underscore the urgency for Malaysia to bolster its transport network.

A key component of this strategy is the East Coast Rail Link (ECRL), a 688.3 km railway project backed by China. The ECRL, which connects Kota Bharu to Port Klang, is progressing well, with over 180 km of tracks laid and an anticipated operational date by the end of 2026. This project is crucial for improving freight and passenger transport and alleviating maritime congestion.

To further its goals, Malaysia plans to procure 62 new passenger train sets from China through a long-term leasing arrangement valued at approximately $2.4 billion USD. This procurement is tied to strategic conditions, including increasing Malaysia’s stake in CRC’s manufacturing base in Bataga and localizing at least 40% of the value chain. This localization aims to be achieved through technology transfer, workforce development, and local content requirements. CRC’s Bataga facility, China’s first overseas rail manufacturing plant, already employs a majority of Malaysians and provides training, but Malaysia now seeks greater control and knowledge ownership.

Malaysia’s long-term goals include achieving an 80% rail network utilization rate by 2030 and increasing the number of operating passenger trains, making localized production and maintenance critical for success.

However, challenges exist, particularly concerning technology transfer. While China has demonstrated a willingness to share infrastructure expertise, the transfer of core high-speed rail technology is sensitive due to its strategic and commercial value, and similar requests from other nations have been met with caution. Malaysia also faces internal limitations and risks in absorbing and applying advanced technologies, which will necessitate a robust supply chain, R&D investment, a skilled labor force, and long-term industrial policy to prevent technology leakage.

This partnership between China and Malaysia is at a critical juncture, with the potential to serve as a model for other countries seeking infrastructure development through international cooperation. As Malaysia considers revisiting the Kuala Lumpur-Singapore high-speed rail project, future agreements will likely center on technology governance and value sharing, aiming to strike a balance between Malaysia’s aspirations for self-reliance and China’s industrial interests.


https://www.facebook.com/jeff.mah.5/videos/1322405505490779/?cft[0]=AZW0g8jro4_EZ7WUqYZrAi6H_N6yPEx3OhJG0o-iktzSQ6uwUZHNUOfybUpmKKsYqMUNMc5wpkeZEVseAqXvTcLCQhldUTMsiJkQgLmPEd4z3MgMC0ZZrO5UOoz7KayIPrAA4ta8jpWb1BjGuoa97mYmCutMbhItI97rOjbteViZ2A&tn=%2CO%2CP-R